Your response helps us make our online experience better to provide content that is specific to your role.
Thank you. Your response helps us make our online experience better to provide content that is specific to your role.
Holcim has provided nearly 5,800m² of the Elevate GeoGard EPDM 1.5mm lining membrane for the construction of Alpentherme Gastein in Austria.
Project ID | |
---|---|
Location | Salzburg, Austria |
Application | Natural swimming pools and ponds |
Surface | 5,800 m² |
Membrane | GeoGard EPDM 1.5mm |
Alpentherme Gastein is a luxurious health and leisure spa in the alpine mountains that created 2 unique swimming lakes. The installation was done in only 6 days. The ponds have each 5 meters depth are both are filled with about 4,700 m³ of warm and pure thermal water that is kept clean by a biological filtration system. The thermal water combined with the black liner gives the water a nice blue shimmer.
The bigger pond combines shallow areas for leisure and wide areas for swimmers and stand-up paddlers. The smaller pond is made for sauna lovers that like jumping into pure water between 2 sessions.