Your response helps us make our online experience better to provide content that is specific to your role.
Thank you. Your response helps us make our online experience better to provide content that is specific to your role.
In 2015, the authorities of the Polish town of Zdunska Wola decided to renovate the city’s municipal park, including the renovation of the existing pond.
Project ID | |
---|---|
Location | Zdunska Wola, Poland |
Application | Swimming pond |
Surface | 14,000 m² |
Membrane | PondGard EPDM 1 mm |
A tender for the design and construction was announced. The winning concept proposed not to create a new standard decorative pond, but to completely rebuild the existing one, transforming it into a natural pond with natural filtration.
Because of the abundance of space available, it was possible to create a separate smaller pond for the filtration. So instead of having two areas, as in a regular natural swimming pond, the renovation consisted in creating two separate ponds. In the small pond, the water is naturally threated by plants, a mix of gravels and filters, and then it is pumped back into the larger recreation pond.
In total, approximately 14,000 m² of Elevate’s PondGard EPDM membrane with a thickness of 1 mm were installed by landscaping company Re-Natura to waterproof the renovated ponds.
Works in the park began in 2016. The renovation of the ponds started in 2017 and was finished in 2019.